Project Description

Following the flooding after intense rainstorms, a culvert abutting the new pump station required replacement. Utilizing FEMA funds, OCE provided design, bid and construction review services for the replacement of an existing 5-foot corrugated metal culvert with a precast concrete box culvert with internal dimensions of 6-foot wide by 5-foot tall and 39-foot long.  The installation of this culvert required the realignment of an existing sewer force main and gravity sewer system within the project limits.